Officer Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Frame inspection in Officer

With walls and trusses standing and before the roof is sarked and the walls wrapped, the structure is fully visible.

  • Walls and trusses up and braced, before wrap and insulation
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteSend your details and an Officer inspector will phone you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookWalls and trusses up and braced, before wrap and insulation
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Officer frame inspection

  • Each braced wall checked on the bracing layout
  • Strap bracing hooped over plates
  • Tie-down rods, straps and truss grips
  • Bottom plate overhang at the slab edge
  • Studs plumb and walls straight
  • Lintels sized as specified
  • Nogging and blocking in place
  • Truss layout against the truss plan
  • Slotted brackets on internal walls
  • Plates continuous in bracing walls
  • Steel beams and posts fixed
  • Slab edge condition recorded
  • Physical termite barrier under external walls
Why it matters here

Frame inspections on Officer builds

At frame stage in Officer we record bracing straps not hooped over the plate, bottom plates overhanging the slab, missing truss grips and blocking left out of engineered bracing walls. These decide how the house resists wind for the rest of its life.

What we find at this stage in Officer

  • Strap bracing not hooped over the top plate
  • Plate overhang past the slab beyond 10mm
  • Truss grips missing
  • Blocking absent in bracing walls
  • Walls out of plumb
  • Slotted bracket spacing too wide
Honeycombed concrete along the slab edge, which can weaken it and let moisture in, found during a frame inspection in Officer
Honeycombed concrete along the slab edge, which can weaken it and let moisture in
No physical termite barrier yet fitted beneath the outside walls, found during a frame inspection in Officer
No physical termite barrier yet fitted beneath the outside walls
Sample findings

Sample defects found during our frame inspections in Officer

Annotated findings from Frame inspections.

Strap bracing stopped short of the top plate instead of hooped over and nailed, found during a frame inspection in Officer
Strap bracing stopped short of the top plate instead of hooped over and nailed
Bottom plate hanging past the slab edge by more than the 10mm allowed, found during a frame inspection in Officer
Bottom plate hanging past the slab edge by more than the 10mm allowed
Truss grips not fitted, leaving the trusses without their tie-down hardware, found during a frame inspection in Officer
Truss grips not fitted, leaving the trusses without their tie-down hardware
No blocking to a bracing wall between posi trusses, weakening its lateral restraint, found during a frame inspection in Officer
No blocking to a bracing wall between posi trusses, weakening its lateral restraint

The other stages of a Officer build

  1. Bored piers inspection in Officer1Bored piersHoles bored and cleaned, before the pier concrete
  2. Slab pre-pour inspection in Officer2Slab pre-pourFormwork, steel and pods in, the day before concrete
  3. Lock-up (pre-plaster) inspection in Officer4Lock-up (pre-plaster)Roof, windows and cladding on, before plasterboard
  4. Fixing inspection in Officer5FixingDoors, mouldings and cabinets in, before painting
  5. Waterproofing inspection in Officer6WaterproofingOnce the membrane has cured, ahead of tiling
  6. Pre-handover (PCI) inspection in Officer7Pre-handover (PCI)Roughly seven days out from your PC date

All construction stage inspections in Officer →

Guides

Construction stage guides for Officer

All guides →

Book a frame inspection in Officer

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Officer: common questions

What is the most important thing checked at frame?

Bracing and tie-down. They hold the house together in wind and are covered up at lock-up.

What does plate overhang mean?

The timber bottom plate sitting past the edge of the slab. Beyond 10mm the wall is not properly supported.

Is the frame compared with the engineer's drawings?

Yes. Bracing walls, tie-down and any steel are compared with the engineering and the bracing plan.

Is the termite barrier part of this inspection?

Where a physical barrier is meant to sit under the external walls, we note whether it is there.

What does a frame check take, start to finish?

About an hour for a single storey home, longer for a double storey.

What if the frame is already wrapped?

We check what remains visible and say in the report what could not be seen.

CallGet a Free Quote