Officer Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

New Construction Stage Inspections in Officer

Seven separate visits across an Officer build, each booked for the short gap before the next trade buries the work.

  • Pick any stage, or the full set of seven
  • Timed to the builder's program
  • Checked against your engineering
  • Photos marked with locations
  • Report before the next trade
  • Structural items listed first
  • Recheck of earlier items
  • Inspector reachable by phone
Request your quoteSend your details and an Officer inspector will phone you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

The Officer build stages we inspect

On Officer jobs the structural findings cluster at frame and lock-up: packing under trusses, wedged top plates and bracing that is missing or damaged. Slab items are mostly cover and barrier details that take minutes to fix before the pour and cannot be fixed after it.

Frame inspection in Officer

Frame

Walls and trusses up and braced, before wrap and insulation

Strap bracing hooped and nailed, tie-down and truss grips, plate overhang, blocking in bracing walls, plumb and straight walls.

Learn more about the frame inspection →
Sample findings

Sample defects found during our construction stage inspections in Officer

One finding per stage, from piers through to the week before handover.

Our inspectors going through a report
Why Officer owners choose us

Independent. Licensed. Insured.

  • Officer jobs are written up by the same inspector who walked the site, not by an office.
  • Each item names the clause, tolerance or drawing it fails, so the builder cannot wave it off.
  • Handover reports here regularly pick up wet area and flashing items, and we check those first.
  • We know the Officer estates, from Arcadia and Timbertop to Kaduna Park, and book around builder programs.
Guides

New Construction Stage Inspections guides for Officer

All guides →

Book new construction stage inspections in Officer

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

New Construction Stage Inspections in Officer: common questions

Which stage turns up the most serious items in Officer?

Lock-up, closely followed by frame. Packing under trusses and beams with non-structural material, wedged top plates and unsealed roof penetrations have all been recorded at lock-up here.

Can I start with a stage that is already underway?

Yes. Book the next stage that is still open and we also note anything visible from earlier work.

Do you need my plans?

Yes, the architectural set and the engineering. Many Officer findings are about the work not matching the drawings, which can only be judged with them in hand.

How long is each visit?

Usually between forty minutes and an hour and a half, depending on the stage and whether the home is single or double storey.

Where does an Officer stage inspection stop?

We do not test or certify electrical, gas or plumbing work, commission appliances, assess anything already concealed, or provide engineering certification. Licensed trades and your building surveyor cover those.

Who gets the report?

You do, and you decide who to forward it to. Most owners send it straight to the site supervisor.

Will the builder have to fix what you find?

Items that do not meet the contract, the code or the tolerances are the builder's to fix. The report sets out which requirement each item fails so that is clear.

CallGet a Free Quote